Dodson South Canal Headgate Project – Dodson, MT

Battle Ridge Builders contracted with the Malta Irrigation District for this project. The new headgate structure consists of 400+ yards of poured-in-place concrete where the 100 feet wide by 24 feet tall walls are built on footings below the water table. The project included over 5,000 yards of compacted backfill and dike construction, RipRap placement, structural steel component package fabricated in house, and head gate installation.