Image Image Image Image Image
Scroll to Top

To Top

Battle Ridge Builder Construction Projects

Richland Motor Inn – Sidney, MT Richland Motor Inn – Sidney, MT Richland Motor Inn – Sidney, MT

By Battle Ridge Builders

On 18, Apr 2013 | In | By Battle Ridge Builders

Richland Motor Inn – Sidney, MT

Battle Ridge Builders installed the HardiePLANK siding and Malarkey roofing on this 30 room hotel addition and was later contracted to reroof the main hotel a total of 220 squares.

General – Markovich Construction

Roosevelt Inn – Watford City, ND Roosevelt Inn – Watford City, ND

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Roosevelt Inn – Watford City, ND

Battle Ridge Builders was referred by James Hardie to complete this hotel addition in Watford City, North Dakota.  With multiple styles of Hardie Plank, tall walls and freezing temperatures this job was a great challenge, and another win for Battle Ridge Builders.

General – Shingobee Builders, INC

Microtel Inn & Suites – Minot, ND Microtel Inn & Suites – Minot, ND

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Microtel Inn & Suites – Minot, ND

This is the second Microtel that Battle Ridge Builders has sided in 2012. This 25,000 square foot siding project was completed in six weeks using James Hardie lap siding.

General – Langlas & Associates

Fort Maginnis Bridge – Lewistown, MT Fort Maginnis Bridge – Lewistown, MT Fort Maginnis Bridge – Lewistown, MT

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Fort Maginnis Bridge – Lewistown, MT

Battle Ridge Builders removed a collapsed bridge and replaced it with a pre-fabricated steel bridge that had a 61 foot span. This project included placing two 26,000 lbs bridge sections, pounding 40 foot H-piles, and complete site work restoration of the streambed and embankments.

General – Battle Ridge Builders

Thriftway – Anaconda, MT Thriftway – Anaconda, MT

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Thriftway – Anaconda, MT

Battle Ridge Builders completed this project in 6 days installing 6,000 square feet of custom finished Maxi-PLANK materials.

General – Markovich Construction

Custom Framing, Siding, & Roofing – Big Sky, MT Custom Framing, Siding, & Roofing – Big Sky, MT Custom Framing, Siding, & Roofing – Big Sky, MT

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Custom Framing, Siding, & Roofing – Big Sky, MT

Battle Ridge Builders framed, sided, and roofed this custom house in Beehive Basin.

General – Teton Heritage Builders

Billings Housing Authority – Billings, MT Billings Housing Authority – Billings, MT Billings Housing Authority – Billings, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Billings Housing Authority – Billings, MT

The Billings Housing Authority apartment reside was an exterior renovation covering 10 apartment buildings designated for low income housing. Battle Ridge Builders removed and recycled over 15 tons of steel and aluminum siding, while replacing it with over 23,000 sq ft of 5” Hardie cement fiber siding. Also 73 steel doors were removed, recycled and replaced. Battle Ridge Builders is equipped with the tools and knowledge for complete exterior renovations.

General – Battle Ridge Builders

 

Custom Siding & Roofing – Big Sky, MT Custom Siding & Roofing – Big Sky, MT Custom Siding & Roofing – Big Sky, MT Custom Siding & Roofing – Big Sky, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Custom Siding & Roofing – Big Sky, MT

This Residence is a 6000 square foot custom home that Battle Ridge Builders sided with a combination of 9 inch lap siding, 3×8 beam corners, and vertical shiplap siding. Battle Ridge Builders also installed the first molded series of Davinci Bellaforte composite shakes, along with a bonderized standing seam metal system.

General – Teton Heritage Builders

 

Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Fairmont Hot Springs Resort – Fairmont, MT

Battle Ridge Builders worked with Markovich Construction and Fairmont Hot Springs on their on-going renovation to the Fairmont Resort. During the renovations, BRB tore off the old wood siding and replaced it with corrugated metal giving it a new modern look. The renovations also included replacing the Natatorium roof, which involved tear off, re-sheathing, and installing 170 squares of new Malarkey shingles.

General – Markovich

 

Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Hardin High School – Hardin, MT

This 44,000 sq foot addition and remodel included an intense metal scope that required precision craftsmanship and determination to sweat out those 105 degree days. This building is proof that Battle Ridge Builders can handle any metal siding projects thrown its way.

General – Langlas Associates