Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Monforton School – Bozeman, MT

Monforton School added a large addition to their already established elementary school. During this project, Battle Ridge Builders installed roughly 6,000 sq feet of heavy gauge steel siding, using custom bent trim. In addition, approximately 800 lineal feet of 24 gage soffit was put up. Battle Ridge Builders also installed a specialized Tamyln cement fiber system on the schools main entry way.

General – R&R Taylor

Solberg Dam – Ray, ND Solberg Dam – Ray, ND Solberg Dam – Ray, ND

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Solberg Dam – Ray, ND

The Solberg dam repair was a cooperative project between Battle Ridge Builders and Ducks Unlimited. To improve wildlife habitat near Ray,ND. This project required removing an existing spill way, backfilling, and pouring a new spill way to prevent erosion. This is the second project done for Ducks Unlimited.

General – Battle Ridge Builders

 

Lake Creek Marsh – Dagmar, MT Lake Creek Marsh – Dagmar, MT Lake Creek Marsh – Dagmar, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Lake Creek Marsh – Dagmar, MT

Battle Ridge Builders became increasingly familiar with the infrastructure industry during 2012 by taking on four separate projects that included concrete demo & installation, excavation, and pile driving. The Lake Creek Marsh was a project with Fish Wildlife and Parks and Duck Unlimited. It was also to improve migratory bird habitat near Dagmar, MT.

General – Battle Ridge Builders

Ferguson Residence – Bozeman, MT Ferguson Residence – Bozeman, MT

By Battle Ridge Builders

On 25, Nov 2010 | In | By Battle Ridge Builders

Ferguson Residence – Bozeman, MT

The Ferguson project was a large duplex we sided using hardy product with board and bat, lap siding and cedar shakes on large gables. The project was completed for Case Construction.

General – Case Construction

Langhor Siding – Bozeman, MT Langhor Siding – Bozeman, MT Langhor Siding – Bozeman, MT Langhor Siding – Bozeman, MT Langhor Siding – Bozeman, MT

By Battle Ridge Builders

On 25, Nov 2009 | In | By Battle Ridge Builders

Langhor Siding – Bozeman, MT

The Langhor project included removing the old vinal siding and replacing it with Canexal Siding to repair for hail damage. The finished product looks fantastic!