Battle Ridge Builder Construction Projects

Roosevelt Inn – Watford City, ND Roosevelt Inn – Watford City, ND

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Roosevelt Inn – Watford City, ND

Battle Ridge Builders was referred by James Hardie to complete this hotel addition in Watford City, North Dakota.  With multiple styles of Hardie Plank, tall walls and freezing temperatures this job was a great challenge, and another win for Battle Ridge Builders.

General – Shingobee Builders, INC

Microtel Inn & Suites – Minot, ND Microtel Inn & Suites – Minot, ND

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Microtel Inn & Suites – Minot, ND

This is the second Microtel that Battle Ridge Builders has sided in 2012. This 25,000 square foot siding project was completed in six weeks using James Hardie lap siding.

General – Langlas & Associates

Thriftway – Anaconda, MT Thriftway – Anaconda, MT

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Thriftway – Anaconda, MT

Battle Ridge Builders completed this project in 6 days installing 6,000 square feet of custom finished Maxi-PLANK materials.

General – Markovich Construction

Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT Fairmont Hot Springs Resort – Fairmont, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Fairmont Hot Springs Resort – Fairmont, MT

Battle Ridge Builders worked with Markovich Construction and Fairmont Hot Springs on their on-going renovation to the Fairmont Resort. During the renovations, BRB tore off the old wood siding and replaced it with corrugated metal giving it a new modern look. The renovations also included replacing the Natatorium roof, which involved tear off, re-sheathing, and installing 170 squares of new Malarkey shingles.

General – Markovich

 

Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT Hardin High School – Hardin, MT

By Battle Ridge Builders

On 25, Nov 2012 | In | By Battle Ridge Builders

Hardin High School – Hardin, MT

This 44,000 sq foot addition and remodel included an intense metal scope that required precision craftsmanship and determination to sweat out those 105 degree days. This building is proof that Battle Ridge Builders can handle any metal siding projects thrown its way.

General – Langlas Associates

Microtel Inn & Suites – Sidney, MT Microtel Inn & Suites – Sidney, MT Microtel Inn & Suites – Sidney, MT Microtel Inn & Suites – Sidney, MT Microtel Inn & Suites – Sidney, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Microtel Inn & Suites – Sidney, MT

This 23,000 sq foot siding project in Sidney, MT was completed using James Hardie products. This job took about 4 weeks to reach substantial completion, which fell approximately 20% ahead of schedule. Battle Ridge Builders prides itself on good communication with project supervisors and other subcontractors to ensure the job is done efficiently as possible.

General – Langlas Associates

 

Anderson Precast – Bozeman, MT Anderson Precast – Bozeman, MT Anderson Precast – Bozeman, MT Anderson Precast – Bozeman, MT Anderson Precast – Bozeman, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Anderson Precast – Bozeman, MT

Anderson Precast was a 3 month project that began with Battle Ridge Builders completing all the steel erection work. This involved standing 38 ft columns built to carry a sliding indoor crane system, and placing 50 ft clear-span steel beams. Battle Ridge Builders also completed the steel stud office build-out and installed the 16,000 sq feet of steel siding.

General – Terry Sinnema, INC

Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT Monforton School – Bozeman, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Monforton School – Bozeman, MT

Monforton School added a large addition to their already established elementary school. During this project, Battle Ridge Builders installed roughly 6,000 sq feet of heavy gauge steel siding, using custom bent trim. In addition, approximately 800 lineal feet of 24 gage soffit was put up. Battle Ridge Builders also installed a specialized Tamyln cement fiber system on the schools main entry way.

General – R&R Taylor

Ketterer II Building – Bozeman, MT

By Battle Ridge Builders

On 25, Nov 2009 | In | By Battle Ridge Builders

Ketterer II Building – Bozeman, MT

A law firm addition in downtown Bozeman, MT that included a hang, tape, and texture.

General – Martel

 

Capers Restaurant – Bozeman, MT

By Battle Ridge Builders

On 25, Nov 2008 | In | By Battle Ridge Builders

Capers Restaurant – Bozeman, MT

Capers Restaurant (off of North 19th) was a tenant improvement project including framing, sheetrock and trim.