Image Image Image Image Image
Scroll to Top

To Top

Projects by Battle Ridge Builders

Stormwater Pretreatment Retrofit Project – Missoula, MT Stormwater Pretreatment Retrofit Project – Missoula, MT Stormwater Pretreatment Retrofit Project – Missoula, MT Stormwater Pretreatment Retrofit Project – Missoula, MT

By Battle Ridge Builders

On 02, Feb 2018 | In | By Battle Ridge Builders

Stormwater Pretreatment Retrofit Project – Missoula, MT

This project consisted of the installation of a hydrodynamic separation device (HDS) to pretreat stormwater before it flows into the Clark Fork River. Battle Ridge Builders had to have shoring engineered and constructed in house to excavate 24 feet below grade in an established park. During excavation and placement of the HDS device the storm drain had to be rerouted while remaining in service. As an additive alternate Battle Ridge was also contracted to install a new loading zone which included demolition, new curb and gutter and asphalt patching.

Wastewater Effluent Clarifier Rehabilitation – Bozeman, MT Wastewater Effluent Clarifier Rehabilitation – Bozeman, MT Wastewater Effluent Clarifier Rehabilitation – Bozeman, MT

By Battle Ridge Builders

On 02, Feb 2018 | In | By Battle Ridge Builders

Wastewater Effluent Clarifier Rehabilitation – Bozeman, MT

This project was to rehabilitate the existing effluent clarifier system at the Bozeman Fish Technology Center. Repairing and upgrading the system comprised of demolishing and removing the components of the existing lamella clarifier, surface preparation of sediment basin walls and floors with a protective coating. New catwalks and handrails were fabricated in house and added to the top of the sedimentation basins. The existing piping and electrical were demolished and new piping and electrical were installed, a new auger screen was provided and installed to filter effluent leaving the sedimentation basins.

Pardue Road Bridge – Cut Bank, MT Pardue Road Bridge – Cut Bank, MT Pardue Road Bridge – Cut Bank, MT

By Battle Ridge Builders

On 12, Dec 2017 | In | By Battle Ridge Builders

Pardue Road Bridge – Cut Bank, MT

Construction of a new 85-ft single span precast prestressed bulb-tee bridge over Cut Bank Creek, with an abutment foundation of cast-in-place concrete cap, backwall and wing walls supported on driven steel piles. Remove and disposal of existing bridge, installation of detour bridge, substructure & superstructure construction, bridge railings and riprap placement.

Owner: Glacier County

 

Bowman Haley Outlet Gate Valve – Bowman, ND Bowman Haley Outlet Gate Valve – Bowman, ND

By Battle Ridge Builders

On 12, Aug 2017 | In | By Battle Ridge Builders

Bowman Haley Outlet Gate Valve – Bowman, ND

Demolish existing & provide a new butterfly gate valve, slide gate, wet well access ladder, low flow piping & cathodic protection, all 36ft below the surface. Custom designed and built lifting device to remove a 6,000lb valve.

Owner: US Army Corps of Engineers 

Red Lodge Creek Road Bridge – Red Lodge, MT Red Lodge Creek Road Bridge – Red Lodge, MT Red Lodge Creek Road Bridge – Red Lodge, MT

By Battle Ridge Builders

On 23, Jun 2017 | In | By Battle Ridge Builders

Red Lodge Creek Road Bridge – Red Lodge, MT

Removal of the existing bridge, structure excavation, installation and supply of structural backfill and riprap, supply and drive steel pile foundation, cast-in-place concrete pile caps, wingwalls & end diaphragms, supply and installation of the 78-foot single–span bulb-tee precast, prestressed concrete bridge superstructure, bridge rail & approach guardrail.

Owner: Carbon County

 

Boadle Road Bridge – Choteau, MT Boadle Road Bridge – Choteau, MT Boadle Road Bridge – Choteau, MT

By Battle Ridge Builders

On 23, Jun 2017 | In | By Battle Ridge Builders

Boadle Road Bridge – Choteau, MT

Construction of a new precast concrete bridge spanning over Pishkun Canal approximately 2 miles south of Pishkun Reservoir. The work included excavation and backfill for new abutments, PIP concrete bearing abutments, and the installation of the new 96 foot, prestressed bulb tee concrete bridge superstructure; along with the installation of ancillary work such as guardrails, riprap, approach roadwork, and traffic control measures.

Owner: Public Land/Water Access Association

 

Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT

By Battle Ridge Builders

On 23, Jun 2017 | In | By Battle Ridge Builders

Williams Bridge – Jefferson County, MT

Emergency repairs to the historic four span structure crossing the Jefferson River. The work consisted of pier stabilization, steel stringer supply and installation and riprap installation.

Owner: Jefferson County

Beaverhead County Landfill Container Site – Dillon, MT

By Battle Ridge Builders

On 12, May 2017 | In | By Battle Ridge Builders

Beaverhead County Landfill Container Site – Dillon, MT

Complete earthwork, structural poured-in-place concrete walls and slabs, and fencing to construct a solid waste container site for Beaverhead County Landfill

Owner: Beaverhead County Solid Waste District

Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE

By Battle Ridge Builders

On 12, Apr 2017 | In | By Battle Ridge Builders

Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE

Remove water and control gate leakage while removing existing deteriorated concrete with hydro-demolition and waste water treatments, then furnish and place reinforced cast-in-place concrete to repair existing outlet works stilling basin.

Owner: Bureau of Reclamation 

Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT

By Battle Ridge Builders

On 30, Dec 2016 | In | By Battle Ridge Builders

Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT

Battle Ridge Builders contracted with the DNRC to do work on the Deadman’s Basin Headgates and Diversion Wall. They demoed and replaced 222′ of the diversion dam wall, diverted the Musselshell River, excavated and dewatered up to 17ft below the rivers surface and 11ft below the water table. They had to maintain this dewater for 70 days while pouring in place 235 yards of footers and walls [up to 17ft tall], they maintained erosion control, fabricated steel components for walkways and handrails, installed 5 head gates [6’x6′] with less than 2gpm leak rates. Installed 1850 yards of riprap ramp and grouted the entire structure for fish passage. Battle Ridge completed this project 10% ahead of schedule.

Engineering: Morrison-Maierle

Funding: DNRC

Owner: Deadman’s Basin Water Users

Photo by John Warner/Montana FWP