Projects by Battle Ridge Builders

Dodson South Canal Headgate Project – Dodson, MT Dodson South Canal Headgate Project – Dodson, MT Dodson South Canal Headgate Project – Dodson, MT

By Battle Ridge Builders

On 20, Dec 2016 | In | By Battle Ridge Builders

Dodson South Canal Headgate Project – Dodson, MT

Battle Ridge Builders contracted with the Malta Irrigation District for this project. The new headgate structure consists of 400+ yards of poured-in-place concrete where the 100 feet wide by 24 feet tall walls are built on footings below the water table. The project included over 5,000 yards of compacted backfill and dike construction, RipRap placement, structural steel component package fabricated in house, and head gate installation.

 

West Yellowstone Compost Facility – West Yellowstone, MT West Yellowstone Compost Facility – West Yellowstone, MT West Yellowstone Compost Facility – West Yellowstone, MT

By Battle Ridge Builders

On 23, Nov 2016 | In | By Battle Ridge Builders

West Yellowstone Compost Facility – West Yellowstone, MT

Project consisted of demolishing concrete and conveyor systems, removing over 50,000 lbs of composting equipment & trommel, repairing and repouring concrete, and installing large steel doors.

Missoula Fire Department Boat Ramp – Missoula, MT Missoula Fire Department Boat Ramp – Missoula, MT

By Battle Ridge Builders

On 23, Jul 2016 | In | By Battle Ridge Builders

Missoula Fire Department Boat Ramp – Missoula, MT

Extension of an existing concrete boat ramp by 30 feet and associated channel and bank stabilization and re-vegetation.

South Fork Sixteenmile Creek Fish Barrier – Bozeman, MT South Fork Sixteenmile Creek Fish Barrier – Bozeman, MT South Fork Sixteenmile Creek Fish Barrier – Bozeman, MT

By Battle Ridge Builders

On 10, Jan 2016 | In | By Battle Ridge Builders

South Fork Sixteenmile Creek Fish Barrier – Bozeman, MT

This project included building an access road to the site, dewater the creek, form and pour in place a 90 yard concrete structure in creek bed on bedrock, and placement of structural backfill. Battle Ridge Builders worked with the the Montana Fish, Wildlife, & Parks and the Forest Service on this project.

 

Owners: Montana Fish, Wildlife, & Parks & Custer Gallatin National Forest

Grayling Creek – Gallatin National Forest, MT Grayling Creek – Gallatin National Forest, MT Grayling Creek – Gallatin National Forest, MT Grayling Creek – Gallatin National Forest, MT Grayling Creek – Gallatin National Forest, MT Grayling Creek – Gallatin National Forest, MT

By Battle Ridge Builders

On 22, Jul 2015 | In | By Battle Ridge Builders

Grayling Creek – Gallatin National Forest, MT

Battle Ridge Builders poured the abutments and placed the precast beams of this 106 foot snowmobile bridge for the USDA Forest Service.

Owner: USDA Forest Service

Cottonwood Flume Repair – Hyalite Canyon, Bozeman, MT Cottonwood Flume Repair – Hyalite Canyon, Bozeman, MT Cottonwood Flume Repair – Hyalite Canyon, Bozeman, MT

By Battle Ridge Builders

On 14, Jul 2015 | In | By Battle Ridge Builders

Cottonwood Flume Repair – Hyalite Canyon, Bozeman, MT

Battle Ridge Builders built this for the Department of Natural Resources & Conservation and was given only 30 days to complete. This project had difficult access, only allowing foot traffic. Battle Ridge Builders had to carry all the structural concrete & steel; up to half a mile.

Battle Ridge Builders self performed all aspects of construction including fabricating & erecting structural steel, cutting existing footings, epoxing rebar cages and pouring new footings on top of the existing concrete. This project included unique flume construction, using rolled steel bands, to bend 18 gage steel pan.

Funding: DNRC

Owner: Middle Creek Water User’s Association

 

Benton Lake Water Control Structure – Great Falls, MT Benton Lake Water Control Structure – Great Falls, MT Benton Lake Water Control Structure – Great Falls, MT

By Battle Ridge Builders

On 04, Mar 2015 | In | By Battle Ridge Builders

Benton Lake Water Control Structure – Great Falls, MT

This project was located on a national wildlife refuge. For this project Battle Ridge Builders created a coffer dam, removed the drawdown gate valve, installed an Agri-Drain water control structure, connected the Agri-Drain WCS to existing 6” dia. PVC pipe, fabricated and installed the slide gate out of billet aluminum. Battle Ridge Builders were also involved in the shaping of downstream channel side slopes, installation of rock riprap, repair of numerous muskrat runs in embankment, and roadway reconstruction.

General: Battle Ridge Builders, LLC

Funded & Contracted by: Ducks Unlimited

East Brewer Check Structure & Canal Lining – Musselshell, MT East Brewer Check Structure & Canal Lining – Musselshell, MT East Brewer Check Structure & Canal Lining – Musselshell, MT

By Battle Ridge Builders

On 04, Mar 2015 | In | By Battle Ridge Builders

East Brewer Check Structure & Canal Lining – Musselshell, MT

Battle Ridge Builders, LLC removed the existing check structure, replace it with a poured in place concrete check structure, installed a new slide gate, cleaned and reshaped the canal, lined the canal with geofiber, placed riprap and installed walkway and handrails. Total construction time lasted 19 days.

General: Battle Ridge Builders

Owner: DMWUA

 

French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT

By Battle Ridge Builders

On 16, Dec 2014 | In | By Battle Ridge Builders

French Creek Culvert Replacement – Gallatin National Forest, MT

Battle Ridge Builders replaced an existing 48″ culvert with a new 36-foot precast concrete bridge and gabion foundations.  The site was extremely inaccessible, the 48,000 lbs bridge sections were shuttled using heavy haul trailers and a 70 ton crane.

 

Owner – USDA Forest Service

Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND

By Battle Ridge Builders

On 22, Oct 2013 | In | By Battle Ridge Builders

Sand Creek Culvert Replacement – Watford City, ND

Battle Ridge Builders completed this in three weeks for the USDA, which consisted of building a detour, removing the old culvert and replacing it with a new precast three sided box culvert. Battle Ridge showed their skills and knowledge by completing a majority of this project while the USDA was shutdown and key personnel where on furlough due to the lack of government funding.