Benton Lake Water Control Structure – Great Falls, MT Benton Lake Water Control Structure – Great Falls, MT Benton Lake Water Control Structure – Great Falls, MT

By Battle Ridge Builders

On 04, Mar 2015 | In | By Battle Ridge Builders

Benton Lake Water Control Structure – Great Falls, MT

This project was located on a national wildlife refuge. For this project Battle Ridge Builders created a coffer dam, removed the drawdown gate valve, installed an Agri-Drain water control structure, connected the Agri-Drain WCS to existing 6” dia. PVC pipe, fabricated and installed the slide gate out of billet aluminum. Battle Ridge Builders were also involved in the shaping of downstream channel side slopes, installation of rock riprap, repair of numerous muskrat runs in embankment, and roadway reconstruction.

General: Battle Ridge Builders, LLC

Funded & Contracted by: Ducks Unlimited

East Brewer Check Structure & Canal Lining – Musselshell, MT East Brewer Check Structure & Canal Lining – Musselshell, MT East Brewer Check Structure & Canal Lining – Musselshell, MT

By Battle Ridge Builders

On 04, Mar 2015 | In | By Battle Ridge Builders

East Brewer Check Structure & Canal Lining – Musselshell, MT

Battle Ridge Builders, LLC removed the existing check structure, replace it with a poured in place concrete check structure, installed a new slide gate, cleaned and reshaped the canal, lined the canal with geofiber, placed riprap and installed walkway and handrails. Total construction time lasted 19 days.

General: Battle Ridge Builders

Owner: DMWUA

 

French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT French Creek Culvert Replacement – Gallatin National Forest, MT

By Battle Ridge Builders

On 16, Dec 2014 | In | By Battle Ridge Builders

French Creek Culvert Replacement – Gallatin National Forest, MT

Battle Ridge Builders replaced an existing 48″ culvert with a new 36-foot precast concrete bridge and gabion foundations.  The site was extremely inaccessible, the 48,000 lbs bridge sections were shuttled using heavy haul trailers and a 70 ton crane.

 

Owner – USDA Forest Service

Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND Sand Creek Culvert Replacement – Watford City, ND

By Battle Ridge Builders

On 22, Oct 2013 | In | By Battle Ridge Builders

Sand Creek Culvert Replacement – Watford City, ND

Battle Ridge Builders completed this in three weeks for the USDA, which consisted of building a detour, removing the old culvert and replacing it with a new precast three sided box culvert. Battle Ridge showed their skills and knowledge by completing a majority of this project while the USDA was shutdown and key personnel where on furlough due to the lack of government funding.

Fort Maginnis Bridge – Lewistown, MT Fort Maginnis Bridge – Lewistown, MT Fort Maginnis Bridge – Lewistown, MT

By Battle Ridge Builders

On 28, Jan 2013 | In | By Battle Ridge Builders

Fort Maginnis Bridge – Lewistown, MT

Battle Ridge Builders removed a collapsed bridge and replaced it with a pre-fabricated steel bridge that had a 61 foot span. This project included placing two 26,000 lbs bridge sections, pounding 40 foot H-piles, and complete site work restoration of the streambed and embankments.

General – Battle Ridge Builders

Solberg Dam – Ray, ND Solberg Dam – Ray, ND Solberg Dam – Ray, ND

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Solberg Dam – Ray, ND

The Solberg dam repair was a cooperative project between Battle Ridge Builders and Ducks Unlimited. To improve wildlife habitat near Ray,ND. This project required removing an existing spill way, backfilling, and pouring a new spill way to prevent erosion. This is the second project done for Ducks Unlimited.

General – Battle Ridge Builders

 

Lake Creek Marsh – Dagmar, MT Lake Creek Marsh – Dagmar, MT Lake Creek Marsh – Dagmar, MT

By Battle Ridge Builders

On 24, Nov 2012 | In | By Battle Ridge Builders

Lake Creek Marsh – Dagmar, MT

Battle Ridge Builders became increasingly familiar with the infrastructure industry during 2012 by taking on four separate projects that included concrete demo & installation, excavation, and pile driving. The Lake Creek Marsh was a project with Fish Wildlife and Parks and Duck Unlimited. It was also to improve migratory bird habitat near Dagmar, MT.

General – Battle Ridge Builders