Projects by Battle Ridge Builders

Boadle Road Bridge – Choteau, MT Boadle Road Bridge – Choteau, MT Boadle Road Bridge – Choteau, MT

By Battle Ridge Builders

On 23, Jun 2017 | In | By Battle Ridge Builders

Boadle Road Bridge – Choteau, MT

Construction of a new precast concrete bridge spanning over Pishkun Canal approximately 2 miles south of Pishkun Reservoir. The work included excavation and backfill for new abutments, PIP concrete bearing abutments, and the installation of the new 96 foot, prestressed bulb tee concrete bridge superstructure; along with the installation of ancillary work such as guardrails, riprap, approach roadwork, and traffic control measures.

Owner: Public Land/Water Access Association

 

Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT Williams Bridge – Jefferson County, MT

By Battle Ridge Builders

On 23, Jun 2017 | In | By Battle Ridge Builders

Williams Bridge – Jefferson County, MT

Emergency repairs to the historic four span structure crossing the Jefferson River. The work consisted of pier stabilization, steel stringer supply and installation and riprap installation.

Owner: Jefferson County

Beaverhead County Landfill Container Site – Dillon, MT

By Battle Ridge Builders

On 12, May 2017 | In | By Battle Ridge Builders

Beaverhead County Landfill Container Site – Dillon, MT

Complete earthwork, structural poured-in-place concrete walls and slabs, and fencing to construct a solid waste container site for Beaverhead County Landfill

Owner: Beaverhead County Solid Waste District

Silvertip Cabins – Big Sky, MT Silvertip Cabins – Big Sky, MT Silvertip Cabins – Big Sky, MT

By Battle Ridge Builders

On 23, Apr 2017 | In | By Battle Ridge Builders

Silvertip Cabins – Big Sky, MT

Complete siding on 17, 2,200 square foot chalets in Big Sky, change ordered to supply siding, soffit & fascia materials. Supplied and installed custom patina metal panels. Phase two included 5 more chalets.

 

Prime Contractor: Teton Heritage Builders 

Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE

By Battle Ridge Builders

On 12, Apr 2017 | In | By Battle Ridge Builders

Outlet Works Stilling Basin Repairs – Medicine Creek Dam, NE

Remove water and control gate leakage while removing existing deteriorated concrete with hydro-demolition and waste water treatments, then furnish and place reinforced cast-in-place concrete to repair existing outlet works stilling basin.

Owner: Bureau of Reclamation 

Southwest Hospital Critical Access Addition – Bowman, ND Southwest Hospital Critical Access Addition – Bowman, ND Southwest Hospital Critical Access Addition – Bowman, ND Southwest Hospital Critical Access Addition – Bowman, ND

By Battle Ridge Builders

On 31, Dec 2016 | In | By Battle Ridge Builders

Southwest Hospital Critical Access Addition – Bowman, ND

26,000 wall feet of Thermax insulation system with Liquid Armor air barrier & Knighwall girt system both vertical and horizontal, using 1000 salt wash Rodenhouse screws. Installation of Tamlyn extruded aluminum and James Hardie panel cladding system & 24 ga steel siding.

 

Prime Contractors: M.A. Mortenson

Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT

By Battle Ridge Builders

On 30, Dec 2016 | In | By Battle Ridge Builders

Deadman’s Basin Head gate Replacement & Diversion Wall – Harlowton, MT

Battle Ridge Builders contracted with the DNRC to do work on the Deadman’s Basin Headgates and Diversion Wall. They demoed and replaced 222′ of the diversion dam wall, diverted the Musselshell River, excavated and dewatered up to 17ft below the rivers surface and 11ft below the water table. They had to maintain this dewater for 70 days while pouring in place 235 yards of footers and walls [up to 17ft tall], they maintained erosion control, fabricated steel components for walkways and handrails, installed 5 head gates [6’x6′] with less than 2gpm leak rates. Installed 1850 yards of riprap ramp and grouted the entire structure for fish passage. Battle Ridge completed this project 10% ahead of schedule.

Engineering: Morrison-Maierle

Funding: DNRC

Owner: Deadman’s Basin Water Users

Photo by John Warner/Montana FWP

 

Western Triangle Ag Research Center – Conrad, MT

By Battle Ridge Builders

On 28, Dec 2016 | In | By Battle Ridge Builders

Western Triangle Ag Research Center – Conrad, MT

General contract to construct a 1,088 square foot warehouse. Battle Ridge self performed the concrete, framing, roofing, & siding scopes as well as some interior finishes.

MSU Parking Garage – Bozeman, MT MSU Parking Garage – Bozeman, MT

By Battle Ridge Builders

On 23, Dec 2016 | In | By Battle Ridge Builders

MSU Parking Garage – Bozeman, MT

Installing custom fabricated bar grating façade on $12 million parking garage including fabricating & designing over 3,000 components.

 

Prime Contractor: Martel Construction

Dodson South Canal Headgate Project – Dodson, MT Dodson South Canal Headgate Project – Dodson, MT Dodson South Canal Headgate Project – Dodson, MT

By Battle Ridge Builders

On 20, Dec 2016 | In | By Battle Ridge Builders

Dodson South Canal Headgate Project – Dodson, MT

Battle Ridge Builders contracted with the Malta Irrigation District for this project. The new headgate structure consists of 400+ yards of poured-in-place concrete where the 100 feet wide by 24 feet tall walls are built on footings below the water table. The project included over 5,000 yards of compacted backfill and dike construction, RipRap placement, structural steel component package fabricated in house, and head gate installation.